Case Study

Automotive – Tier 1 Driveline and Drivetrain Supplier

Background:

A Tier 1 automotive supplier faced urgent operational breakdowns and asset deterioration. With key customer deadlines at risk, the company required a full-scale turnaround to stabilize operations and restore confidence.

Critical Issues:

  • Persistent equipment failures and low operational efficiency
  • Deteriorating assets creating quality risks
  • Inactive preventative maintenance systems
  • Imminent deadlines with limited internal support capacity

Approach:

Crossover mobilized an on-site team, scaling from 5 to 45 experts over a six-month period. We executed 24/7 operational coverage, stabilized performance, and built a sustainable preventative maintenance program embedded into daily operations.

Key Actions:
  • Delivered 24/7 maintenance operations to restore equipment uptime
  • Reinstated quality control and implemented robust detection systems
  • Developed standard work for preventative maintenance tasks
  • Assigned specialists to drive throughput improvements
  • Upgraded critical assets and implemented robot modifications with traceability
  • Delivered a structured sustainability roadmap

Results:

  • Restored production flow and stabilized key processes
  • Embedded preventative maintenance as a core operating discipline
  • Rebuilt internal capability, improved uptime, and re-established OEM confidence

By the Numbers

+42%
increase in efficiency (from 18% to 60%)
0
daily machine breakdowns (down from 4–5)
6 months
from deployment to full recovery